Indiana NRCS Engineering Design Spreadsheets

NRCS will not be responsible for errors that might be generated by the spreadsheets or consequences related to the use of the spreadsheets and associated errors.

Selected files are available to download in Microsoft Excel format or Microsoft Word format.
 

Workbook Title Description Excel Last Update
Alternative Waterway Design Version 1.5

Alternative design method can be used for some grassed waterways with drainage areas less than 40 acres and slopes steeper than 1%.

green ball

4-25-07

Aluminum Toewall

Calculates design of aluminum toewall structure

green ball 2-15-06
Cost Estimate

One page cost estimates for all common practices.  Lists commonly included items for each practice.

green ball

6-30-04

Concrete Toewall

Calculates the capacity and rebar requirements for a reinforced concrete toewall structure.

green ball 4-10-08
Earthen Liner

Calculates the thickness of a compacted earthen liner when laboratory soil information is entered.

green ball 11-1-04
Fence

Contains detailed drawing sheets on various types of fence, including panel fence and check-out sheet.

green ball 2-28-07
Levee Volumes by Fill Height

Calculates fill volumes in a levee or dam when top width, side slopes and depth of fill are entered.

green ball

2-12-07

Levee Volumes with Ground Slope

Calculates fill volumes in a levee or dam when top width, side slopes, ground slope, existing and planned elevations are entered.

green ball 6-30-04
Lined Channel Design

Calculates velocity and capacity of trapezoidal and parabolic lined channels.  Includes rock size velocity table.

green ball 6-30-04
Pipeline

Calculates pipe and pumping requirements for grazing systems.

green ball 2-1-07
Pond Volume

Calculates waste storage pond volume when depth, top widths and side slopes are entered.  Differentiates waste volume and total excavation.

green ball 6-30-04
Profile Plot

Plots out a profile along CL of a levee or dam when stations, existing elevations and planned elevations are entered in a table.

green ball 6-30-04
Rock Chute Design w/plan

Calculates design of rock chute.  Includes plan sheets.  (IN-ENG-36 without design still available in Standard Drawings)

green ball 5-5-08
Swine Composter

Worksheet to calculate size and number of bins.

green ball 2-13-06
WASCoB

Calculates design of individual water and sediment control basin and includes plan sheets.

green ball 2-28-08
Waterway Design

Calculates design of a grassed waterway and includes plan sheets.

green ball 4-25-07
Waterway with Cross Sections - Test Version

Waterway with Cross Sections - Test Version Instructions

Calculates the design of a grassed waterway.  Includes plan sheets and draws cross sections.

Instruction sheet for use with test version of the water design sheet.

green ball